Our projects

The work, and who did it

What we are building, and what the people building it have done before.

  • RC Structure
Core team

Past key projects, delivered by the people here

Data centres, semiconductor fabs, rail infrastructure, hospital and pharmaceutical works — delivered in Singapore by our core team in their previous roles, before they came together at Hua Xing.

  • Reinforced concrete frame of the AirTrunk data centre under a tower craneData centre

    AirTrunk Data Centre, Phase 1 & 2

    Main contractor: Obayashi (Singapore) · Completed

    Hyperscale data centre structure, where slab tolerances and plant loadings drive the design.

  • Wide excavation and substructure works for a semiconductor fabrication plantSemiconductor

    GlobalFoundries Semiconductor Plant

    Main contractor: Exyte Singapore · Completed

    Vibration-sensitive fabrication facility — the least forgiving structural environment in industrial building.

  • Top-down basement construction with earth-retaining wall and slab reinforcementHealthcareTop-down construction

    ECC — MOH project at SGH Campus

    Main contractor: Penta-Ocean Construction

    Top-down basement on a live hospital campus, where the site above had to keep functioning.

  • Labrador Tower under construction with a tower crane alongsideCommercial high-riseTop-down construction

    Labrador Tower — SP Group HQ

    Main contractor: Hyundai Engineering & Construction

    High-rise structure built top-down, with a core-led programme and a tight site footprint.

  • Addition and alteration works in progress alongside an operating pharmaceutical plantPharmaceutical

    GSK Tuas — A&A works

    Main contractor: Lendlease Singapore

    Structural alteration inside an operating pharmaceutical facility that could not shut down.

  • The completed Alcon facilityPharmaceutical

    Alcon Phase 2 — A&A works

    Main contractor: Exyte

    A second pharmaceutical A&A package for the same main contractor — repeat work is its own reference.

  • Raft foundation reinforcement fixed and ready for inspectionPublic infrastructure

    LTA CR101

    Main contractor: China Jingye Engineering

    Cross Island Line civil works under LTA supervision, to authority inspection regimes.

Reinforced concrete deck fully fixed with rebar before a pour
Deck rebar before a pour
Excavation with pile caps and ground beam reinforcement being fixed
Substructure and pile caps
Precast viaduct segment being lifted into place at night
Night works, precast erection
Reinforced concrete frame of a data centre under construction
Data centre frame
Start a conversation

Got something similar on the table?

Send us the brief and we will tell you what the closest comparable job took to deliver — programme, sequencing and the parts that usually bite.