RC StructurePasir Ris Executive Condominium
Reinforced concrete structure package for an Executive Condominium development — our largest current contract in Singapore.
See the packageHua Xing Development Pte. Ltd. is a specialist contractor in reinforced concrete structure and curtain wall works, with our own hundred-strong site team. We also take small main-contract projects under BCA General Builder Class 2.
Prefer to talk it through?+65 9176 2666
If your budget or your date will not carry the scope, we say so at the enquiry stage — before anyone commits.
Our own labour, not passed down another tier of subcontract
Seventeen to thirty years on large projects in China and Singapore
Reinforced concrete structure and curtain wall, not a trade list
Every enquiry acknowledged within two working days
Incorporated in 13 March 2020 and operating from Ubi, Hua Xing Development Pte. Ltd. takes on projects where the constraints are real — occupied buildings, fixed opening dates, tight access and budgets that have to hold.
We stay deliberately lean so the people who price your project are the people who build it. That means fewer hand-offs, faster decisions on site, and a single name to call when something needs resolving.
Office, retail and mixed-use buildings — new build, A&A and full-envelope upgrading.
Production facilities, warehouses and workshops, including heavy-duty flooring and dock infrastructure.
Landed and cluster housing, from new builds to reconfiguration and basement additions.
Community facilities, clinics and education spaces upgraded in phases while they stay open.
Whether you need a single accountable main contractor, a turnkey design-and-build partner, or an owner's representative watching the numbers — the scope below is where we do our best work.
A single team for the design and the build — so the drawing you approve is the house you get, and nobody is left arguing between a designer and a contractor.
We are extending into landed residential construction and interior design, delivered together with a design practice we work with exclusively. You appoint one party. The design is tested against buildability, cost and programme while it is still on paper, and the same people who drew it are answerable for it on site.
Layout, structure, services and finishes are resolved together. Decisions that normally surface as a variation on site get settled during design instead.
Reinforced concrete is what our team does every day on large Singapore projects. A basement, a cantilever or a transfer beam on a landed plot is not unfamiliar ground.
A named project manager from first sketch to the end of the defects liability period, with the designer in the same room rather than on the other side of a contract.
An itemised proposal covering design and construction, with variations priced and signed before the work proceeds.
Construction goes wrong in predictable ways: unclear scope, unpriced variations, unsafe shortcuts and a programme nobody owns. These are the habits we built the company around.
Works are planned around a written risk assessment, daily toolbox briefings and a site supervisor who has authority to stop work. A safe site is also the fastest site — incidents are the most expensive delay there is.
You get a priced breakdown, not a single lump figure. Variations are raised, priced and signed before the work proceeds, so the final account holds no surprises.
A named project manager and site supervisor stay with your project from award to the end of the defects liability period. No handover between departments, no repeating yourself.
Inspection and test plans, material submittals and photographic records are kept as the works proceed — so handover is a formality rather than a scramble.
Much of our work happens in buildings that cannot close. We sequence around tenants, trading hours, noise limits and shared access instead of asking you to shut down.
If a budget or a date will not carry the scope, we say so at the enquiry stage. We would rather lose a tender than start a project that was never going to land.
What we are building, and what the people building it have done before.
RC StructureReinforced concrete structure package for an Executive Condominium development — our largest current contract in Singapore.
See the packageCore team — past key projects
AirTrunk Data Centre, Phase 1 & 2
Data centre · for Obayashi (Singapore)
GlobalFoundries Semiconductor Plant
Semiconductor · for Exyte Singapore
ECC — MOH project at SGH Campus
Healthcare · for Penta-Ocean Construction
Labrador Tower — SP Group HQ
Commercial high-rise · for Hyundai Engineering & Construction
GSK Tuas — A&A works
Pharmaceutical · for Lendlease Singapore
Alcon Phase 2 — A&A works
Pharmaceutical · for Exyte
LTA CR101
Public infrastructure · for China Jingye Engineering
Delivered in Singapore by our core team in their previous roles, before they came together at Hua Xing.
No project is a black box. Each stage has a deliverable you can hold us to, and nothing moves forward until the previous stage is signed off.
We listen to the brief, the budget and the date that matters. If we are not the right fit, you will hear it in the first conversation.
A site walk with the people who will actually build it — measuring constraints, existing services, access and structural conditions before anything is priced.
A scoped, itemised proposal with a programme, exclusions stated plainly and the assumptions we priced against written down.
Works executed under a baseline programme with weekly progress reporting, a costed variation register and continuous safety and quality supervision.
Joint inspection, snag closure, as-built and warranty documentation, then twelve months of defects liability support on building works.
If your question is not here, ask it directly — you will get a straight answer rather than a brochure.
Have a drawing set, a tender document or just a rough idea? Send it across and we will tell you what is realistic.
Reinforced concrete structure and glass curtain wall works as a specialist subcontractor to main contractors, addition and alteration (A&A) works, BIM design and coordination, landed design and build, and small main-contract projects under our BCA General Builder Class 2 registration. Commercial, industrial and residential projects across Singapore.
A&A works on an occupied building typically run 4 to 12 months depending on the structural scope. A new build is generally 12 to 24 months. We commit to a programme only after a site survey, because access, existing conditions and authority submissions drive the timeline more than floor area does.
Yes. We coordinate with the Qualified Person and handle submissions to the relevant authorities — BCA, SCDF, NEA, PUB and URA as applicable — along with landlord and building management office permits where the works require them. The applicable submissions for your project are confirmed in writing at proposal stage.
You receive an itemised proposal rather than a single lump figure: scope by trade, the programme, stated exclusions and the assumptions the price was built on. Where the scope cannot be fully defined yet, we identify it as a provisional sum instead of burying contingency in the rate.
Much of our work does. We plan around permitted working hours, noise and dust limits, tenant access and shared loading routes, and we publish a rolling look-ahead so occupants know what is happening and when. After-hours and phased sequencing are available where the building cannot tolerate daytime disruption.
Building works carry a twelve-month defects liability period as standard. During that period you report a defect to the same project manager who delivered the job, and we attend to it. Manufacturer warranties on supplied equipment and systems are passed through to you with the handover documentation.
Every enquiry is acknowledged within two working days. For live tenders with a closing date, tell us the date in your enquiry and we will confirm straight away whether we can meet it.
Send us the brief, the budget and the date that matters. You will get a straight read on feasibility within two working days — not a sales call.
Islandwide across Singapore · Enquiries acknowledged within 2 working days