A&A Works

Occupied Commercial Block A&A

Structural alteration and envelope upgrade of a commercial block that has to keep trading throughout.

Illustration of a six-storey commercial block with a glazed façade
Category
A&A Works

The usual constraint

The building stays tenanted. Structural alterations have to run floor by floor, noisy works are confined to permitted hours, and every temporary propping arrangement needs sign-off before load transfer.

How we sequence it

  1. 1

    Sequence the works vertically so only one floor is affected at a time, with a rolling two-week look-ahead issued to every tenant.

  2. 2

    Carry out hacking and coring outside business hours under an agreed noise-control regime, with dust screens and negative-pressure enclosures.

  3. 3

    Maintain a permanent alternate access route so ground-floor retail never loses frontage.

Typical scope

  • Structural hacking and reinforced concrete alterations
  • New external façade and glazing system
  • Lift lobby and common area reconfiguration
  • M&E riser upgrading and re-routing
  • Authority submissions and QP coordination
Start a conversation

Have a project in mind? Let's talk about what it really takes.

Send us the brief, the budget and the date that matters. You will get a straight read on feasibility within two working days — not a sales call.

Islandwide across Singapore · Enquiries acknowledged within 2 working days