Occupied Commercial Block A&A
Structural alteration and envelope upgrade of a commercial block that has to keep trading throughout.
- Category
- A&A Works
The usual constraint
The building stays tenanted. Structural alterations have to run floor by floor, noisy works are confined to permitted hours, and every temporary propping arrangement needs sign-off before load transfer.
How we sequence it
- 1
Sequence the works vertically so only one floor is affected at a time, with a rolling two-week look-ahead issued to every tenant.
- 2
Carry out hacking and coring outside business hours under an agreed noise-control regime, with dust screens and negative-pressure enclosures.
- 3
Maintain a permanent alternate access route so ground-floor retail never loses frontage.
Typical scope
- Structural hacking and reinforced concrete alterations
- New external façade and glazing system
- Lift lobby and common area reconfiguration
- M&E riser upgrading and re-routing
- Authority submissions and QP coordination
Other projects
Have a project in mind? Let's talk about what it really takes.
Send us the brief, the budget and the date that matters. You will get a straight read on feasibility within two working days — not a sales call.
Islandwide across Singapore · Enquiries acknowledged within 2 working days
